Some light work is going to be done later this year on the new Nipigon River Bridge.
The Ministry of Transportation says they need to fix a piece of concrete after it popped off.
During late fall of 2014, water that was required for the construction operations froze and broke off a piece of concrete on the north face of a tower.
It will be repaired this summer when weather is more suitable for repair work.

